Laserfiche WebLink
Sabrina Fandler '— Cslifft3-Fd BSP <br /> From: Jane Zimmerman <br /> Sent: Thursday, March 03, 2016 9:21 AM <br /> To: Sabrina Fandler <br /> Subject: RE: BSP #15-003, 5900 36th Ave W <br /> Hi Sabrina— <br /> I just realized that I had already commented on this project! Therefore, I have been making waaaaayyyyyyy too big a <br /> deal of providing comments on the revision!! Argghhhh!!! <br /> In summary,the revised submittal doesn't change my previous comments. © <br /> Jane <br /> From: Jane Zimmerman <br /> Sent: Tuesday, November 17, 2015 7:21 AM <br /> To: Sabrina Fandler <br /> Subject: BSP #15-003, 5900 36th Ave W <br /> Hi Sabrina— <br /> Stormwater from this project shall be managed in accordance with the City of Everett's 2010 Stormwater Management <br /> Manual. The most current version of WWHM2012 shall be used for stormwater modeling and design, including a 15- <br /> minute time interval. <br /> Construction Stormwater Pollution Prevention will be required for this project in compliance with City standards. In <br /> addition, because the project will disturb more than an acre of land,the applicant must apply for coverage under the <br /> Washington State Department of Ecology's Construction Stormwater General Permit. <br /> Thank you, <br /> Jane <br /> 1 <br />