3. Address and phone number of applicant and contact person:
<br /> Contact: Bob Fadden — Lance Mueller&Associates/Architects
<br /> 130 Lakeside, Suite 250
<br /> Seattle, WA 98122
<br /> Phone: (206) 325-2553 ext. 108
<br /> bfadden@lmueller.com
<br /> 4. Date checklist prepared: September 20, 2016
<br /> 5. Agency requesting checklist: City of Everett Planning and Community Development
<br /> 6. Proposed timing or schedule (including phasing, if applicable):
<br /> Construction Start: January 15, 2016
<br /> January 2016—Site grading, TECP, and storm water detention and conveyance
<br /> April, 2016—Construction of Buildings A and B
<br /> 2017—Construction of Buildings C and D
<br /> 7. Do you have any plans for future additions, expansion, or further activity related to or
<br /> connected with this proposal? If yes, explain.
<br /> Tenant improvement after each phase is completed.
<br /> 8. List any environmental information you know about that has been prepared, or will be
<br /> prepared, directly related to this proposal.
<br /> Cultural Resources Assessment for Soundview Business Campus, Everett, Snohomish County,
<br /> Washington by Tierra Right Of Way Company, report Number 2014-077, August 6, 2014.
<br /> Habitat Assessment and Wildlife Corridor Enhancement Plan for Soundview Technology Center,
<br /> Everett, WA. Wetland Resources Group. Project No. 16123, dated September 15, 2016.
<br /> Biological Elevation for Soundview Business Campus, Everett, WA.
<br /> Wetland Resources, Inc., Project Number 14109. US Army Corps of Engineers, Reference
<br /> Number: NWS-2014-838, Revision 1, dated September 15, 2014.
<br /> Geotechnical Engineering Study proposed Soundview Technology Center, 36th Ave. West,
<br /> Everett, WA. Earth Solutions NW LLC— Report Number ES-4011.03, dated June 22, 2016.
<br /> Arborist Report—Soundview Business Campus, S.A. Newman, Forest Engineers Summary Tree
<br /> Inventory Report, Tree Risk Assessment and Tree, Renton/Removal Plan, dated May 13, 2016.
<br /> Phase 1 Environmental Report prepared by Geotech Consultants Inc., dated March 2007.
<br /> Stability Assessment Study prepared by Earth Solutions, Inc., dated September 10, 2016
<br /> Phase 1 Environmental Report prepared by Earth Solutions Inc., dated October 23, 2016.
<br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 15
<br />
|