Laserfiche WebLink
I <br />NAVIX <br />SITE I CIVIL <br />May 23, 2017 <br />Ms. Sabrina Fandler <br />Engineering/Permit Services <br />City of Everett <br />Everett, Washington 98021 <br />11400 s.e. 8th street, suite 345 1 s 425,453.9501 <br />bellevue, wa 98004 T 425.453.8208 <br />e info@navixeng <br />.com <br />� g.com <br />Subject: Soundview Technology Center; Everett, Washington <br />PW1612-024 Public Works Permit Comments Response <br />Dear Ms. Fandler, <br />Thank you for your review of Soundview Public Works permit submittal. We have received the city <br />comments on the redlined plans dated 4/27/17, and the email from Jane Zimmerman dated 5/17/17, <br />and have revised the plans and storm report accordingly. <br />Within this letter we have included a compilation of City comments received and the corresponding <br />responses. The numbering is per the original City comments received. <br />PUBLIC WORKS COMMENTS <br />The following below corrections have be made to the following documents as part of the PW Permit <br />Submittal: <br />Civil Plans <br />Please see all redlines on the attached plans for required corrections. Frequently, redlines will be <br />stand-alone and will not have an associated item in this corrections letter. <br />Response: The redline comments have been addressed and comment responses have been <br />provided in blue pencil on the original mark-up. <br />Stormwater Comments (Jane Zimmerman email dated 5/17/17) <br />Stormwater Drainage Report: <br />Page 6 — please replace the words "infiltration into existing soil does not exist" for perforated stub - <br />out connections, permeable pavement and bioretention BMPs with the following words: "infiltration <br />