My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
>
Land Use Decision Documents
>
5900 36TH AVE W PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 9:33:59 AM
Creation date
4/9/2025 7:47:38 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Ms. Sabrina Fandler <br />May 23, 2017 <br />on this site is not recommended due to reasonable concerns regarding erosion and down gradient <br />flooding." <br />Response: Section revised as requested. <br />MWS units <br />Please include the most recent GULD document in the drainage report (the latest one is date 12/15) <br />and also include the GULD document in the M&O Manual. <br />Response: Most recent GUILD now provided in drainage report and M&O Manual. <br />Maintenance and Operation Manual <br />Please provide the maintenance and operation information for the stormwater facilities in a <br />separate document entitled "Maintenance and Operations Manual", and include a first page clearly <br />indicating the party responsible for M&O. In addition, please include the following statement on the <br />first page: <br />"A copy of this maintenance and operations manual shall be retained on -site or within <br />reasonable access to the site and shall be transferred with the property to any new owner. A <br />log of maintenance activities indicating what actions were taken shall be kept and be made <br />available for inspection by the City of Everett upon request." <br />Response: A separate M&O Manual is now provided with the note requested. <br />Civil Plans: <br />Vault details: <br />Control structure details on Sheets C-2.15 — 2.20 must match City standard drawings 415 & 416. <br />Response: Control structure details now match City standard drawings 415 and 416. <br />Note 9: Please specify construction in accordance with Chapter 3.2.3 of Volume III of the 2014 <br />Stormwater Management Manual for Western Washington (instead of the 2010 City of Everett <br />Stormwater Management Manual, which is now obsolete...). <br />Response: Note #9 has been revised to reflect DOE manual reference rather than COE manual. <br />Sheets C-2.7, 2.10, and 2.11: The vault access requirements shown on the plan view sheets must be <br />in compliance with the Detention Vault Access criteria found in Section 3.2.3 in Volume III of the 2014 <br />SWMMWW and the following note, which is specific to the City of Everett Design and Construction <br />Standards: Maintenance access points must be provided at each end of each "V" in the vault floor to <br />facilitate sediment removal (4-4.4(3)). All maintenance access openings in the tops of the detention <br />zly <br />
The URL can be used to link to this page
Your browser does not support the video tag.