My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
>
Address Records
>
BROADWAY
>
3726
>
MOUNTAIN PACIFIC BANK
>
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:47:53 PM
Creation date
4/9/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
MOUNTAIN PACIFIC BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Example #3 <br />Remove clapper dur- <br />ing flushing operation <br />Install a plug or <br />4 in - <br />a nipple and cap <br />102 mm) <br />and flush <br />pipe <br />underground <br />before overhead <br />piping is <br />Fire <br />connected <br />valve <br />Rough-In/Cover <br />Water can be <br />discharged through <br />open end of 4 in. <br />(102 mm) pipe or <br />through Y or Siamese <br />connection with hose <br />as shown above <br />From underground <br />1. Concealment - No drywall or other coverings shall be permitted to conceal any <br />components of the fire sprinkler system until after the Rough-In/Cover Inspection <br />has been completed and approved by the fire code official. <br />2. Scheduling -The contractor shall schedule for the inspection using eTRAKiT online <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the next business day. <br />3. Approved Plans - Consult Approved/Stamped set of plans. <br />4. Size & Type of Piping - Verify proper type and size of piping. <br />5. Changes - Confirm the installation of the piping does not have excessive change of <br />directions that are not indicated on approved plans. (Excessive use of extra <br />fittings, such as elbows may affect hydraulic calculations). <br />6. Penetrations - All piping penetrations through fire rated assemblies have been <br />properly sealed by an approved method. Fire -stopping materials intended for use <br />on nonmetallic piping penetrations shall be investigated for compatibility with the <br />nonmetallic pipe materials. <br />7. Hanger/Bracing/Supports - Piping hangers, sway bracing, and supports shall be <br />installed as per plans and NFPA. <br />PASS FAIL N/A <br />Fire Marshal's Office 1425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 14.13.2020 1 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.