Laserfiche WebLink
Post Indicator Valve (PIV): <br />23. Accessible - Both Remote Post Indicator Valves and Wall Post Indicator Valves <br />shall be easily accessible, and the Open/Closed indicator shall be visible at all <br />times. <br />24. Cutable Lock -The PIV shall be provided with a cutable padlock. <br />25. Clear Space -A clear working space not less than 36 inches in width, 36 inches in <br />depth and 78 inches in height shall be provided. <br />System in Full Operation: <br />26. Systems Normal - Ensure all systems are normal <br />27. Alarm Off Test -Ensure the Fire Alarm is off of test with the monitoring company. <br />PASS FAIL N/A <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />PASS FAIL N/A <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />28. NFPA 13 Report -The installer shall complete and sign the NFPA 13 Contractor's ❑ ❑ ❑ <br />Material and Test Certificate for Aboveground Piping prior to final approval of the <br />system. (If the building is also equipped with a standpipe system the installer shall <br />also complete and sign the NFPA 14 Contractor's Material and Test Certificate for <br />Aboveground Piping prior to final approval of the system.) <br />29. Keys for Knox Box - Keys for the Fire Sprinkler Room and PIV(s) shall be provided <br />so they may be placed into the Knox Box. <br />Fire Marshal's Office 1425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 <br />4.13.2020 1 Page 11 <br />