Laserfiche WebLink
Ryan Hammer <br /> From: Ryan Hammer <br /> Sent: Tuesday, October 4, 2022 2:32 PM <br /> To: kfbeddow@hotmail.com; peaceresides@hotmail.com <br /> Subject: City of Everett - 5612 Commercial Ave (B2210-010) First Building Review <br /> Owner: Kathleen Kingsley <br /> Job Address: 5612 Commercial Ave <br /> Plan Check Number: B2210-010, First Building Review <br /> Good Afternoon Keith, <br /> Per our phone conversation this afternoon, the proposed project has been reviewed for compliance with the <br /> provisions of the building codes adopted and amended by the state of Washington and the city of <br /> Everett. The comments below must be addressed before a permit can be issued. These comments address <br /> building issues only. If Structural comment #1 can be satisfied by adding an additional post, I can redline the <br /> plans and approve the permit with additional redlined notes. Please advise. <br /> Code citations provided in the following review comments reference the 2018 International Residential Code <br /> (IRC) and 2018 International Building Code (IBC). Amendments to the adopted building codes by Washington <br /> Administrative Code (WAC) Title 51 are incorporated into the referenced code citations. Citations provided in <br /> the comments reference the IRC unless noted otherwise. The codes, including WAC amendments where <br /> applicable, can be viewed using the following links: <br /> • 2018 IRC: https://up.codes/viewer/washington/wa-residential-code-2018 <br /> • 2018 IBC: https:/Jup.codes/viewer/washington/wa-building-code-2018 <br /> In order for the processing of your application to continue, the following documentation shall be submitted to <br /> Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if applicable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project for <br /> compliance with the adopted building codes. Upon submittal of the revised documents, your application will <br /> be given priority and the review will recommence. <br /> CAIJ' C - (2--- CEA-7K <br />