My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 39TH ST 2025-06-24
>
Address Records
>
39TH ST
>
1020
>
1020 39TH ST 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 11:38:15 AM
Creation date
4/9/2025 1:37:02 PM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
1020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
area. Work enclosing this area appear to have been performed without permits and should be shown <br /> as new work. <br /> 8. Sheet A2 indicates that the project includes significant remodel to the upper floor level. This appears <br /> to include expanding a portion of the building area onto the existing covered deck at the SE <br /> corner. The submitted drawings are not sufficient for the proposed work. Reframing of the floor is <br /> anticipated. Sections and details for the walls and floors should be provided. The new exterior wall <br /> elements should be insulated per the WSEC. <br /> 9. The plan on Sheet AS only appear to represent the roof framing construction. The ceiling construction <br /> is not shown. Additional requirements including but not limited to the roof insulation and ventilation <br /> are required. <br /> 10. Continuing with the previous comment, additional structural details should be provided for the framing <br /> supporting the roof and the foundations. The note addressing the "brace" construction to support the <br /> ridge and hip framing is not sufficient to indicate the proposed work. Sections and details should be <br /> provided. A fastener schedule per IRC Table R602.3(1) should be included. <br /> 11. The interior wall in the area of the overframing appears to be a bearing wall. The framing providing <br /> the load path supporting the roof needs to be shown, including but not limited to wall construction, <br /> floor framing is supporting the walls, and foundations. <br /> 12. The proposed work includes modifications to the exterior walls, including creating a new <br /> window. Details for reframing and infilling the walls should be included. <br /> 13. The window for the Bedroom in the SE corner of the building has been modified and does not appear <br /> to satisfy the requirements for an emergency egress opening. <br /> 14. The "Edge Detail" in Detail 2/A5 does not appear to represent the roof shown in the plan. Clarify <br /> where this condition occurs. <br /> 15. The proposed project includes increasing the conditioned space of the building. Energy credits are <br /> required per WSEC Section R406. The required credits should be normalized using Table R406.2. <br /> 16. Exhaust fans are required in the bathrooms. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> - Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.