support the ridge and hip framing is not sufficient to indicate the proposed work. Sections and details <br /> should be provided. A fastener schedule per IRC Table R602.3(1) should be included. <br /> 11. The interior wall in the area of the overframing appears to be a bearing wall. The framing providing <br /> the load path supporting the roof needs to be shown, including but not limited to wall construction, <br /> floor framing is supporting the walls, and foundations. <br /> 12. The proposed work includes modifications to the exterior walls, including creating a new <br /> window. Details for reframing and infilling the walls should be included. <br /> 13. The window for the Bedroom in the SE corner of the building has been modified and does not appear <br /> to satisfy the requirements for an emergency egress opening. <br /> 14. The "Edge Detail" in Detail 2/A5 does not appear to represent the roof shown in the plan. Clarify <br /> where this condition occurs. <br /> 15. The proposed project includes increasing the conditioned space of the building. Energy credits are <br /> required per WSEC Section R406. The required credits should be normalized using Table R406.2. <br /> 16. Exhaust fans are required in the bathrooms. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> x Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> Phone Hours: M/W/T: 8 am - 12 pm & 1 pm —3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 3 <br />