My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
>
Address Records
>
BROADWAY
>
931
>
SEPA 016 - 008 - TEUTSCH PARTNERS
>
Geotech Report
>
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:15:58 AM
Creation date
4/11/2025 8:26:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
SEPA 016 - 008 - TEUTSCH PARTNERS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Student Housing: 931 Broadway Street, Everett, Washington <br /> December 8, 2015 <br /> percent fines). The capillary break material should meet the gradational requirements <br /> provided in Table 2, below. <br /> Table 2—Capillary Break Gradation <br /> Sieve Size Percent Passing <br /> 3/4-inch 100 <br /> No. 4 0— 10 <br /> No. 100 0—5 <br /> No. 200 0— 3 <br /> The capillary break should be placed on the subgrade that has been compacted to a dense <br /> and unyielding condition. <br /> A 10-mil polyethylene vapor barrier should also be placed directly below the slab. <br /> Construction joints should be incorporated into the floor slab to control cracking. <br /> 4.4 RETAINING AND BASEMENT WALL DESIGN PARAMETERS <br /> Retaining and basement walls should be designed to resist the lateral earth pressures <br /> exerted by the soils behind the wall. Proper drainage provisions should also be provided <br /> behind the walls to intercept and remove groundwater that may be present behind the <br /> wall. Our geotechnical recommendations for the design and construction of the <br /> retaining/basement walls are presented below. <br /> 4.4.1 Lateral Earth Pressures <br /> Cantilever walls should be designed for an equivalent fluid pressure of 35 pcf for a level <br /> backfill condition behind the walls assuming the walls are free to rotate. If the walls are <br /> restrained at the top from free movement, such as basement walls with a floor diaphragm, <br /> an equivalent fluid pressure of 50 pcf should be used for a level backfill condition behind <br /> the walls. Permanent walls should be designed for an additional uniform lateral pressure <br /> of 6H psf for seismic loading, where H corresponds to the buried depth of the wall. <br /> The recommended lateral pressures assume the backfill behind the walls consists of a free <br /> draining and properly compacted fill with adequate drainage provisions. <br /> 15-275 931 Broadway,Everett Page lY PanGEO,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.