My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
>
Address Records
>
BROADWAY
>
931
>
SEPA 016 - 008 - TEUTSCH PARTNERS
>
Geotech Report
>
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:15:58 AM
Creation date
4/11/2025 8:26:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
SEPA 016 - 008 - TEUTSCH PARTNERS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Student Housing: 931 Broadway Street, Everett, Washington <br /> December 8, 2015 <br /> 4.4.2 Surcharge <br /> Surcharge loads, where present, should also be included in the design of retaining walls. <br /> We recommend a lateral load coefficient of 0.3 be used to compute the lateral pressure on <br /> the wall face resulting from surcharge loads located within a horizontal distance of one- <br /> half the wall height. <br /> 4.4.3 Lateral Resistance <br /> Lateral forces from seismic loading and unbalanced lateral earth pressures may be <br /> resisted by a combination of passive earth pressures acting against the embedded portions <br /> of the foundations and by friction acting on the base of the wall foundation. Passive <br /> resistance values may be determined using an equivalent fluid weight of 350 pcf. This <br /> value includes a factor of safety of 1.5, assuming the footing is backfilled with structural <br /> fill. A friction coefficient of 0.35 may be used to determine the frictional resistance at the <br /> base of the footings. The coefficient includes a factor of safety of 1.5. <br /> 4.4.4 Wall Drainage <br /> Provisions for wall drainage should consist of a 4-inch diameter perforated drainpipe <br /> placed behind and at the base of the wall footings, embedded in 12 to 18 inches of clean <br /> crushed rock or pea gravel wrapped with a layer of filter fabric. A minimum 18-inch <br /> wide zone of free draining granular soils (i.e. pea gravel or washed rock) is recommended <br /> to be placed adjacent to the wall for the full height of the wall. Alternatively, a <br /> composite drainage material, such as Miradrain 6000, may be used in lieu of the clean <br /> crushed rock or pea gravel. The drainpipe at the base of the wall should be graded to <br /> direct water to a suitable outlet. <br /> 4.4.5 Wall Backfill <br /> Wall backfill should consist of imported, free draining granular material or a soil meeting <br /> the requirements of Gravel Borrow as defined in Section 9-03.14(1) of the WSDOT <br /> Standard Specifications for Road, Bridge, and Municipal Construction (WSDOT 2014). <br /> In areas where space is limited between the wall and the face of excavation, pea gravel <br /> may be used as backfill without compaction. <br /> In our opinion, on-site soils are not suitable for use as wall backfill. <br /> 15-275 931 Broadway,Everett Page // 9y PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.