My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
>
Address Records
>
BROADWAY
>
931
>
SEPA 016 - 008 - TEUTSCH PARTNERS
>
Geotech Report
>
931 BROADWAY SEPA 016 - 008 - TEUTSCH PARTNERS Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:15:58 AM
Creation date
4/11/2025 8:26:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
SEPA 016 - 008 - TEUTSCH PARTNERS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Student Housing: 931 Broadway Street, Everett, Washington <br /> December 8, 2015 <br /> Wall backfill should be properly moisture conditioned, placed in loose, horizontal lifts <br /> less than 8 to 12 inches in thickness, and systematically compacted to a dense and <br /> relatively unyielding condition and to at least 95 percent of the maximum dry density, as <br /> determined using test method ASTM D-1557. Within 5 feet of the wall, the backfill <br /> should be compacted with hand-operated equipment to at least 90 percent of the <br /> maximum dry density. <br /> 4.5 PERMANENT CUT AND FILL SLOPES <br /> Based on the anticipated soil that will be exposed in the planned excavation, we <br /> recommend permanent cut and fill slopes be constructed no steeper than 2H:1 V <br /> (Horizontal:Vertical). <br /> 5.0 TEMPORARY EXCAVATIONS <br /> Temporary excavations should be constructed in accordance with Part N of WAC <br /> (Washington Administrative Code) 296-155. The contractor is responsible for <br /> maintaining safe excavation slopes and/or shoring. <br /> We anticipate the excavation will encounter 2 to 5 feet of fill over glacial till. Based on <br /> these conditions the building excavation can be accomplished as an open cut with a <br /> 1 H:1 V within the fill, and '//H:1 V within the glacial till. <br /> An L-shaped footing may be used to conserve space for temporary excavations. <br /> Temporary excavations should be evaluated in the field during construction based on <br /> actual observed soil conditions. If seepage is encountered, excavation slope inclinations <br /> may need to be reduced. During wet weather, the cut slopes may need to be flattened to <br /> reduce potential erosion or should be covered with plastic sheeting. <br /> If there is not sufficient room to maintain the excavation within the limits of the property, <br /> temporary easements may be needed to slope the excavation into the adjoining properties. <br /> If easements cannot be obtained, then temporary shoring may be needed. <br /> 15-275 931 Broadway,Everett Page /d PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.