My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
>
Land Use Decision Documents
>
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 7:47:29 AM
Creation date
4/11/2025 10:46:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Tenant Name
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> The project is a bus transit center for public transportation. Though the project will generate 24 PM <br /> peak hour trips,those volumes will be offset by the number of drivers who will shift behavior and <br /> change from SOV to transit. This transit facility will reduce total vehicular trips and miles traveled in <br /> the region. <br /> g.Will the proposal interfere with, affect or be affected by the movement of agricultural and <br /> forest products on roads or streets in the area? If so, generally describe. fhelpl <br /> No <br /> h. Proposed measures to reduce or control transportation impacts, if any: fhelpl <br /> The project is projected to reduce the total number of vehicle trips and miles traveled in the region. <br /> 15. Public Services fhelpl <br /> a. Would the project result in an increased need for public services (for example: fire protection, <br /> police protection, public transit, health care, schools, other)? If so, generally describe. fhelpl <br /> The proposed project would not increase the need for public service. <br /> b. Proposed measures to reduce or control direct impacts on public services, if any.fhelpl <br /> The proposed project provides public transit service. <br /> 16. Utilities fhelpl <br /> a. Cir - utilities currently .fable at the site: hel. <br /> :42210 natural gas WI refuse service telephone . - - eptic system, <br /> c. Describe the utilities that are proposed for the project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed <br /> Sewer:City of Everett,Water:City of Everett, Power:PUD, Fiber Optics: Frontier <br /> C. Signature fhelpl <br /> The above answers are true and complete to the best of my knowledge. I understand that the <br /> lead agency is relying on them to make its decision. <br /> Signature: <br /> Name of signee:Jason Walker <br /> Position and Agency/Organization: Preparer of Checklist, Environmental Planning Manager,Perteet <br /> Date Submitted: <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.