Laserfiche WebLink
12. Location of the proposal. Give sufficient information for a person to understand the precise <br /> location of your proposed project, including a street address, if any, and section, township, and <br /> range, if known. If a proposal would occur over a range of area, provide the range or <br /> boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic <br /> map, if reasonably available. While you should submit any plans required by the agency, you <br /> are not required to duplicate maps or detailed plans submitted with any permit applications <br /> related to this checklist. Jhelpl <br /> The 2.72 acre project is located on the southeast corner of the intersection of Seaway Boulevard and <br /> 75th Street Southwest in the City of Everett,Snohomish County,Washington,Section 11,Township <br /> 28N,Range 04E. <br /> B. ENVIRONMENTAL ELEMENTS jhelpl <br /> 1. Earth jhelpl <br /> a. General description of the site:jhelpl <br /> (circle one):(Fla)olling, hilly, steep slopes, mountainous, other <br /> b. What is the steepest slope on the site(approximate percent slope)?jhelpl <br /> The steepest slope on the existing site is approximately 54%. <br /> c. What general types of soils are found on the site(for example, clay, sand, gravel, peat, <br /> muck)? If you know the classification of agricultural soils, specify them and note any <br /> agricultural land of long-term commercial significance and whether the proposal results in <br /> removing any of these soils. jhelpl <br /> Soils on the project site include Alderwood gravelly sandy loam,(15 to 30 percent slope)and <br /> Alderwood Urban land complex(2 to 8 percent slope). No agricultural lands are located in the <br /> vicinity. <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br /> describe. jhelpl <br /> There is no history of unstable soils on the project site. Off-site there are steep slopes on the other side <br /> of 75th Street SW to the south and east of the project site which may include some unstable soils. <br /> a Describe the purpose, type, total area, and approximate quantities and total affected area of <br /> any filling, excavation, and grading proposed. Indicate source of fill. jhelpl <br /> Approximately 810 cubic yards of fill (including crushed surfacing base and top course for pavement <br /> areas and topsoil for planting),and 31,360 cubic yards of cut(including road excavation,foundation <br /> excavation,and gravel borrow haul-away). <br /> f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. <br /> jhelpl <br /> With the project's active implementation of erosion control and BMPs,erosions is not likely. <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example, asphalt or buildings)?jhelpl <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 15 <br />