My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
>
Land Use Decision Documents
>
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 7:47:29 AM
Creation date
4/11/2025 10:46:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Tenant Name
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approximately 82%. <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: jhelpj <br /> The project will utilitze best management practices(BMPs) including sediment pond,cover measures, <br /> silt fence,rock construction entrances,interceptor swales,and check dams. <br /> 2. Air jhelpj <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe and <br /> give approximate quantities if known. jhelpj <br /> During construction,common construction-related emissions from building activities may include <br /> equipment emissions and fugitive dust.The project shall utilize best available control measures <br /> including suppressing dust on construction site with water sprays,prevent dust emissions during <br /> transport of fill material or topsoil by covering load,wetting down,or ensuring adequate freeboard on <br /> trucks,frequent use of a street sweeper machine,schedule work tasks to minimize disruption of <br /> existing vehicle traffic on adjacent streets,and maintain all construction machinery engines in good <br /> mechanical condition to minimize exhaust emissions. The project will not introduce significant <br /> adverse impact to the air and is not expected to present any serious health hazards. <br /> Operation and maintenance of the project is not expected to cause new air quality impacts or worsen <br /> the severity of any existing air impacts. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. jhelpj <br /> No <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: jhelpj <br /> None needed <br /> 3. Water jhelpj <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site (including <br /> year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe <br /> type and provide names. If appropriate, state what stream or river it flows into. 'help] <br /> Narbeck Creek is located east of the project site. Narbeck Creek is a Type N Stream. <br /> 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described <br /> waters? If yes, please describe and attach available plans. [help' <br /> No work in or near the stream,or any impacts to the stream,will occur <br /> 3) Estimate the amount of fill and dredge material that would be placed in or removed <br /> from surface water or wetlands and indicate the area of the site that would be affected. <br /> Indicate the source of fill material. 'help' <br /> None <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.