Laserfiche WebLink
• <br /> 2)What types and levels of noise would be created by or associated with the project on a <br /> short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- <br /> cate what hours noise would come from the site. jhelpl <br /> Construction Noise is anticipated on a short term basis. But would be reserved for typical allowable <br /> hours(7am - 10pm)pursuant to the City of Everett Code. No significant impacts to noise receptors <br /> in the area are known or anticipated from the operation of the facility. <br /> 3) Proposed measures to reduce or control noise impacts, if any:Jhelp' <br /> Construction noise will be short-term and will be limited to the typical allowable hours of 7am to <br /> 10pm pursuant to the City of Everett Code. Construction vehicles and equipment with gasoline or <br /> diesel engines will have mufflers to limit engine noise. <br /> 8. Land and Shoreline Use Jhelpl <br /> a. What is the current use of the site and adjacent properties?Will the proposal affect current <br /> land uses on nearby or adjacent properties? If so, describe. jhelpl <br /> The project site is currently an open grassy field. Land use in the surrounding area is industrial.The <br /> project site lies within the City of Everett Urban Growth Area and is currently zoned M-M Business <br /> Park pursuant to the Everett Municipal Code. <br /> b. Has the project site been used as working farmlands or working forest lands? If so, describe. <br /> How much agricultural or forest land of long-term commercial significance will be converted to <br /> other uses as a result of the proposal, if any? If resource lands have not been designated, <br /> how many acres in farmland or forest land tax status will be converted to nonfarm or <br /> nonforest use? jhelpl <br /> No evidence site has been used as farmland or working forest land. <br /> 1)Will the proposal affect or be affected by surrounding working farm or forest land normal <br /> business operations, such as oversize equipment access, the application of pesticides, <br /> tilling, and harvesting? If so, how: (help' <br /> The proposed project will not affect farms or forest land operations. <br /> c. Describe any structures on the site. Jhelp' <br /> No structures currently exist on the site. <br /> d. Will any structures be demolished? If so, what? (help' <br /> None. <br /> e. What is the current zoning classification of the site?Jhelp' <br /> The site is zoned M-M Business Park pursuant to the Everett Municipal Code. <br /> f. What is the current comprehensive plan designation of the site?jhelpl <br /> The site is designated as Light Industrial pursuant to the Everett Municipal Code. <br /> g. If applicable, what is the current shoreline master program designation of the site?Jhelpj <br /> Not applicable. <br /> h. Has any part of the site been classified as a critical area by the city or county? If so, specify. <br /> Jhelpl <br /> No critical areas are located on the project site. <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 15 <br />