Laserfiche WebLink
Teresa Weldon PERTEET.COM <br /> 2707 COLBY AVENUE,SUITE 900 <br /> City of Everett EVERETT,WA 98201 <br /> Decemvber 5,2016 425.252.7700 <br /> permit application. The actual charges shall be computed by the Public Works Department per the ordinance <br /> in effect at the time and according to the information on the approved plans at the time of building permit <br /> issuance. <br /> Acknowledged. <br /> 6. Approval of construction plans will require demonstration that all pertinent standards and regulations are met. <br /> Acknowledged. <br /> 7. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> Acknowledged.A Stormwater Pollution Prevention Plan (SWPPP)will include these items. <br /> 8. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per City Design <br /> and Construction Standards and Specifications for Development. <br /> Acknowledged.Specifications will require record drawings be prepared. <br /> 9. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works Inspector. <br /> Acknowledged. <br /> 10. The construction plans must be designed from a site survey performed by a licensed State of Washington land <br /> surveyor. <br /> Acknowledged. <br /> 11. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is not <br /> practical due to weather or seasonal problems,the ground must be covered with mulch as directed by the City <br /> Engineer. <br /> Acknowledged. <br /> 12. Temporary erosion control measures for construction activity must be operational prior to commencement of <br /> any clearing or earthwork. <br /> Acknowledged. <br /> 13. Side sewer and water services must meet City of Everett standards. <br /> Acknowledged. <br /> 14. Stormwater shall be managed in accordance with the applicable City of Everett stormwater management <br /> standards. The City will be adopting new stormwater management standards to become effective.on <br /> 1/1/2017. At this time,the City's policies regarding vested rights are contained in EMC 15.28 and Planning <br /> Director Interpretation#09-02. <br /> Acknowledged. <br /> 15. Construction Stormwater Pollution Prevention will be required for this project in compliance with applicable <br /> City standards. In addition, if the overall project will disturb more than an acre of land,the applicant must <br /> Page 2 <br />