My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
>
Land Use Decision Documents
>
7505 SEAWAY BLVD SEPA 016 - 034 - SEAWAY TRANSIT CENTER Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 7:47:29 AM
Creation date
4/11/2025 10:46:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Tenant Name
SEPA 016 - 034 - SEAWAY TRANSIT CENTER
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Teresa Weldon PERTEET.COM <br /> Cityof Everett 2707 COLBY AVENUE,SUITE 900 <br /> EVERETT,WA 98201 <br /> Decemvber 5,2016 425,252.7700 <br /> apply for coverage under the Washington State Department of Ecology's Construction Stormwater General <br /> Permit. <br /> Acknowledged. <br /> 16. Install a traffic signal at the intersection of 75th St SW with the project driveway. <br /> Acknowledged. <br /> 17. Completely reconstruct the traffic signal at the intersection of 75th St SW with the PUD driveway just east of <br /> the project driveway. <br /> Acknowledged. <br /> 18. Provide data infrastructure between the new traffic signal at the project driveway and the City of Everett's <br /> Traffic Management Center. <br /> Acknowledged. Wireless connectivity will be provided. <br /> 19. The site access driveway from Seaway Blvd shall be restricted to right turn ingress only with no egress. <br /> The current project design was developed through early and ongoing coordination with City Engineer <br /> and staff and is understood to meet City Design Standards. <br /> 20. Site design and development within City of Everett Right-of-Way shall not preclude future construction of a <br /> northbound right turn lane along the project frontage on Seaway Blvd or 75th St SW. <br /> The current project design was developed through early and ongoing coordination with City Engineer <br /> and staff and is understood to meet City Design Standards. <br /> Preliminary review by Erik Emerson of the Public Works Department yielded the following comments: <br /> 1. Runoff from City streets shall be kept separate from the private system unless a hold harmless agreement is <br /> provided to the City from Community Transit. The current proposal provides for two separate storm systems, <br /> one for private stormwater runoff and one for runoff from the public Rights of Way,which adequately <br /> addresses the concerns about mixing public and private stormwater runoff. <br /> Acknowledged. <br /> 2. The detention tank proposed for the public system is acceptable in concept with the caveat that steel pipe will <br /> not be accepted. <br /> Acknowledged. <br /> 3. Oil control measures will be required for the bus traffic areas due to the high frequency of bus traffic. <br /> Acknowledged. <br /> 4. The project shall demonstrate compliance with Minimum Requirement#5 for on-site stormwater <br /> management. <br /> Acknowledged. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.