• <br /> 4. Any grading/fill on this site shall be done so as to not impact the surrounding properties. Fill <br /> should be at least 10 feet away from the City sewer manhole on the south end of the property. <br /> 5. Fill contractor must have self contained wheel wash system equal to Stanton portable tire <br /> wash. Must filter wash water. During dry weather contractor must keep water truck onsite for <br /> dust control. Additionally may require need for vacuum/sweeper. <br /> 6. Storm water shall be managed in accordance with the City's 2010 Storm water Management <br /> Manual <br /> 7. The Applicant shall notify Everett transit of any potential street or traffic disruptions that <br /> may affect our bus services in the area. <br /> 8. City streets are to be kept clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 9. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 10. If the proposed fill is intended to support structures at a later date, the fill shall be placed in <br /> accordance with Appendix J of the International Building Code. Should the applicant not <br /> wish to construct a fill intended to support a structure at a later date, the applicant will be <br /> required to submit a letter to the City so stating. The letter will be recorded against the <br /> property. <br /> 11. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> 12. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 7 <br />