Laserfiche WebLink
EVALUATION FOR <br />AGENCY USE ONLY <br />o Assigning employees to a specific parking area such as the existing 150 <br />parking spaces that would remain or designated areas within the other <br />campus parking facilities to minimize excess circulation with employees <br />searching for parking. <br />o If parking becomes an issue during construction, for example shortfalls are <br />not able to be accommodated or excessive parking is occurring in the <br />neighborhood, then additional measures to consider would be temporary <br />valet services or monitoring of the neighborhood. <br />15. PUBLIC SERVICES <br />a. Would the project result in an increased need for public services (for example: <br />fire protection, police protection, public transit, health care, schools, other)? If <br />so, generally describe: <br />The proposed building would be designed with fire sprinklers as well as adequate <br />exterior circulation for fire and other emergency access. A minor increase in police <br />protection may result, but it not expected to be significant. It is unlikely, that other <br />than staff, patrons of the new clinic would ride public transit. No impact to <br />healthcare or schools would occur. <br />b. Proposed measures to reduce or control direct impacts on public services, if <br />any. <br />No impacts area anticipated, therefore no measures are proposed. <br />16. UTILITIES <br />a. Circle utilities currently available at the site: electricity, natural gas, water, refuse <br />service, telephone, sanitary. sue, septic system, other: <br />b. Describe the utilities that are proposed for the project, the utility providing the <br />service, and the general construction activities on the site or in the immediate <br />vicinity which might be needed. <br />Electricity ...............................................Snohomish County PUD No. 1 <br />Natural Gas.............................................................Puget Sound Energy <br />Combined Sewer..............................................................City of Everett <br />Water................................................................................City of Everett <br />The project proposes to relocate the existing combined sewer and water systems <br />within the northeast portion of the site to avoid conflict with the New Clinic. Utility <br />service connections for the new clinic will be provided within the property limits. <br />Dedicated onsite stormwater systems will be constructed as described above under <br />item 3.c.1. <br />Environmental Checklist — Providence Regional Medical Center Everett — North Site Page 31 <br />© mH -KEY <br />