Laserfiche WebLink
Director of Planning a plan to immediately bring the operations <br />into compliance with applicable codes. <br />3_ l 0.7 The design of the Utility Building will be reviewed by the <br />Design Review Committee. <br />3.11 Construction Mitigation: <br />3.12 <br />3.11.1 PEMC will restrict construction activity from 7:00 a.m. to <br />6:00 p.m. weekdays and 8:00 a.m. to 6:00 p.m. on weekends, <br />unless otherwise specifically authorized by the Planning <br />WITNOT M. <br />3.11.2 PEMC will submit a Construction Mitigation Plan prior to each <br />new phase of construction. <br />Master Plan Graphics: See the following attached Figures pertaining to the <br />phasing and development standards of the Master Plan. Internal boundaries <br />between phases and height zones are approximate, but must be reasonably <br />consistent with the boundaries shown in the attached figures. The Planning <br />Director shall determine consistency with these boundaries during the review of <br />each phase of development; and shall have the authority to determine if any <br />change in boundary constitutes a Major Change or Minor Revision as provided in <br />Section 5.0. <br />Figure 1: Zoning <br />Figure 2: Site Master Plan — Conceptual Design Only <br />Fi re : Maximum Allowed Heights and Setback_ <br />Figure 4: Site Master Plan, Phases 1-3 <br />Figure 5: Site Master Plan, Phase 1 <br />Figure 6: Master Plan Site Sections, East/West and NordySouth <br />