Providence Regional Medical Center <br /> Medical Office Clinic and Parking Lot <br /> Project Description—City of Everett Pre-Application <br /> In 2008 a master plan was adopted by the City (Ord. 3090-08) approving plans by Providence <br /> Regional Medical Center for its property in North Everett, including the former "community <br /> college" property north of 13`h Street. The site currently contains the Medical Center's Central <br /> Utility Plant and temporary surface parking, both of which were anticipated in the approved <br /> master plan. <br /> The proposal includes a proposed medical clinic building on the northern portion of the site; the <br /> other is additional temporary surface parking to be added west of the existing Central Utility <br /> Plant. Both are being constructed in accordance with the 2008 plan. <br /> The ultimate master plan is depicted on Figure 3 of City Ordinance 3090-08 (Attached). The <br /> Medical Center will proceed with further implementation of this buildout plan in the coming <br /> months. Ultimate buildout will take several years; the two current projects proposed under the <br /> action are a part of the 2008 master plan. <br /> The clinic facility will be comprised of about 37,000 square feet, occupied mostly by clinical <br /> functions with the remainder used for support services with parking below. Additional surface <br /> parking will be built immediately adjacent to the west. The building footprint lies over the <br /> location of an existing stormwater detention pond, which will be replaced with underground <br /> vaults. Sewer and water utility lines will be relocated to support the future building construction. <br /> The new temporary surface parking project proposed to the west is, in part, a relocation of <br /> existing spaces in the central portion of the site displaced by the new medical/office building. It <br /> will include about 30 additional spaces. Current estimates are that up to 125 surface parking <br /> spaces would be lost with a new building; and will be replaced by 155 spaces under this current <br /> proposal. As indicated, additional parking will be provided below and to the west of the new <br /> building; the exact number is under study. <br /> Questions for discussion at the Pre-Application meeting: <br /> Permitting <br /> 1. Confirmation of the review process for land use entitlements. <br /> 2. Confirmation of the review process for the exterior building materials (at a later date). <br /> Civil/Utility <br /> 3. Oakes and Rockefeller combined sewer- provide peak design flow rates. p Sulu <br /> 4. Confirm predeveloped condition for continuous modelling is existing parking lot <br /> construction and after Central Utility Plant construction. <br />