Laserfiche WebLink
340/4 124)112 einpro,,,i <br /> 2$ <br /> / OF") w - <br /> 5. Confirm that Interim Policy 2-11 (Stormwater Control in the Combined Sewer Area) <br /> applies to the project. <br /> 6. Detention sizing will be based on matching developed discharge durations to <br /> predeveloped durations for the range of predeveloped discharge rates from 50 percent of <br /> the 2-year recurrence interval pea flow up to the full 50-year peak flow (SWMM <br /> Minimum Requirement#7). — c nbrn S uJV_ has .,s\fritiot ll�7ttirt; . <br /> 7. Low Impact design flow control credits can be per 2014 DOE Stormwater managllent <br /> Manual. a &t p t- inos71.ativL,4d_ 006 tv/Gcleminza cFS tlu,e-_1 <br /> rgerkfo-Ja 6 <br /> Landscaping ► fini . DtV'E answer <br /> 8. The relocation of the utilities will likely require removal of some of the require <br /> greenbelt buffer as required in Section 3.5.3 of the master plan. For those areas that <br /> would be affected by utility relocates, do the landscape requirements for restoration <br /> revert back to code requirements for initial tree size? Or do we need to provide larger <br /> trees to match the current tree sizes? <br />