Laserfiche WebLink
S:\MBrick\development review\2016\03-Mar\PreApp16-006.xlsx Printed:3/7/2016 3:27 PM <br /> Project Name Providence Colby Medical Office Traffic Reviewer MGB <br /> Project Location 1815 13th St Dev Reviewer SF <br /> Project Description 37,000 SF clinic with parking below Planner JJ <br /> Received Date 3/1/2016 Due Date 3/8/2016 Review Date 3/7/2016 File# PreApp 16-006 <br /> Area Type EICBD OSW Everett pRemainder <br /> pTRAFFIC STUDY REQUIRED <br /> Site Access <br /> Check Sight Distance(From Table 1, attached) ElAt Intersections DAt Driveways <br /> Residential Development-Vertical Clearance from 30"to 60"above pavement 10'from Back of Curb <br /> _ Commercial Development-Vertical Clearance from 30"to 84"above pavement 15'from Back of Curb <br /> Right In/Right Out Turn Restriction at Condition of Permit Possible in Future <br /> Access point requires traffic control device Stop Sign DYield Sign Signal Median/Island <br /> _All roadways and driveways must meet City of Everett Design Standards <br /> _Access point is public roadway, use City of Everett standard intersections <br /> _Access point is private roadway, use City of Everett standard driveway plans <br /> Check access point Spacing-Adjacent Spacing-Opposite Throat Depth Grade <br /> _All access points must be paved <br /> Reduce potential conflict points Access Points Street Intersections Driveway Cut <br /> _Access point requires realignment <br /> _Access points require consolidation <br /> _Shared access with adjacent property required <br /> X Provide pedestrian access to �X City Sidewalks ❑X All Building Doorways <br /> _Pedestrian facilities must be separated from vehicular traffic <br /> X All traffic control markings and devices on driveways within 50 feet of ROW shall be MUTCD compliant <br /> X All site access shall use existing driveway onto 13th Street/No new site access points permitted <br /> Site Circulation and Parking Issues <br /> _Provide project location map, including adjacent driveways, local and arterial intersections <br /> X Provide detailed site plan, including circulation and parking details <br /> _Reduce potential internal circulation conflicts <br /> Provide at least Total Parking Spaces <br /> Provide at least Visitor Parking Space <br /> _Provide parking analysis indicating total estimated parking demand for project <br /> X Parking layout must be consistent with City of Everett Standards <br /> _All parking areas should be paved <br /> X Pedestrian route should be between parking rows and separated from vehicle drive surface <br /> _Provide commercial vehicle turn-around space/turning radius <br /> X Provide freight vehicle turn-around space/turning radius <br /> _Is freight loading/unloading zone required <br /> Check dumpster locations with disposal company-dumpsters may NOT be located in required parking spaces <br /> City of Everett Staff Use Only 4:9/3 <br />