Laserfiche WebLink
POST -INSTALLED ANCHORS REPORT <br />MAYES lferracon <br />Report Number: M7231404.0001 <br />Service Date: 06/02/23 <br />Report Date: 06/15/23 <br />Client <br />Brixton Everett LLC <br />Attn: Kyle Godat <br />120 S Sierra Ave <br />Solana Beach, CA 92075 <br />Permit No.: B2208-032 <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Redevelopment <br />1402 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7231404 <br />GENERAL INFORMATION <br />Joe Lang with Bayley requested Terracon to be on site to observe adhesive anchors being installed. <br />The construction documents referenced for this observation include: (S 3.1 and Sheet SSK-7 dated 05/03/23). <br />ANCHOR SYSTEM INFORMATION <br />The followina anchor tvoes were used durina todav's observation: <br />Anchor <br />No. <br />Lot No. <br />ICC Report <br />Adhesive <br />Expiration <br />Date <br />Time Until <br />Full Cure <br />Sheet / Detail <br />Referenced <br />1 <br />1000333076 <br />ESR-2508 <br />Set-XP22-N <br />02/13/25 <br />72 hours <br />Sheet SSK-7, S 3.1 <br />ANCHOR INSTALLATION <br />The above anchors were installed as follows: <br />Anchor <br />No. <br />Locations <br />Quantity <br />(tested / total) <br />Anchor size <br />Embedment <br />Spacing & Edge <br />Distance <br />Status* <br />1 <br />A-C.5/1 <br />138 <br />#4 <br />3" <br />24" <br />Complies <br />Holes were prepared as per manufacturer's recommended procedures; vaccum and brush used to clean holes. <br />Ambient Temperature during observation was 55°F. <br />Results of observation(s) performed today were reported to Bayley Construction. <br />COMPLIANCE STATEMENT <br />Based on our observations and testing, the above noted items appear to be in general accordance with the <br />project documents. <br />Services: Special Inspections / Materials Testing <br />Mayes/Terracon Rep.: Ruvim Kravchuk <br />Reported To: Bayley Construction <br />Contractor: <br />Report Distribution: <br />(1) Brixton Everett LLC, Kyle Godat (1) Bayley Construction, Tony Betz <br />(1) City of Everett WA, Permit Services (1) Mayes Testing Engineers, Inc, Donna Reviewed By: <br />(1) Mayes Testing Engineers, Inc, Mike Pollard <br />Mattox Barry Tuttle <br />Project Field Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively forth e use of the client indicated above and shall not be <br />reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not <br />necessarily indicative of the properties of other apparently similar or identical materials. <br />DM010, 04-29-22 Rev.3 Page 1 of 1 <br />