My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 N BROADWAY SEPA 017 - 014 Land Use Decision Documents 2025-05-14
>
Address Records
>
N BROADWAY
>
902
>
SEPA 017 - 014
>
Land Use Decision Documents
>
902 N BROADWAY SEPA 017 - 014 Land Use Decision Documents 2025-05-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 11:39:26 AM
Creation date
4/14/2025 2:38:17 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
902
Tenant Name
SEPA 017 - 014
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> El/ Err <br /> MEMORANDUM <br /> TO: Grace Pollard, Planning Department <br /> FROM: Engineering/Public Services Department <br /> DATE: September 8, 2017 <br /> SUBJECT: SEPA Checklist Review No. SEPA17-014 <br /> PROPOSAL: Remove Gas Station USTd, pumps, and excavate soil. <br /> LOCATION: 902 N Broadway <br /> A review of this project by the Engineering/Public Services Department indicates that the following <br /> conditions should apply: <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site layout, landscaping, utilities, storm drainage, temporary construction erosion <br /> control, and all required improvements in the public right-of-way. Public Works Department <br /> approval of these drawings is required prior to any permits being issued. All improvements <br /> shall be completed, approved and warranted before the Occupancy Permit is issued/final <br /> approval is granted. <br /> 2. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 3. Protect the utilities (sewer, drainage systems etc.) from the contaminated soils. <br /> 4. Stormwater shall be managed in accordance with the City's 2010 Storm water Management <br /> Manual". <br /> 5. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 6. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 7. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 8. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 9. No building materials to be stacked on sidewalk/roadway, and sidewalk/roadway to be kept <br /> clean and open for pedestrian travel. <br /> 10. All contaminated soil and excavated materials from the removal of the ground shall be hauled <br /> and deposited to an approved, permited site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.