Laserfiche WebLink
• <br /> PROPOSED MITIGATEDh <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA 17-0140:0,0%;_74 <br /> September 29,2017 <br /> Description of Proposal: Decommission Gas Station. Removal of three 8,000-gallon double-walled <br /> fiberglass underground storage tanks with associated fuel dispensers and pump station canopy.Excavation of <br /> —500 cubic yards of petroleum contaminated soils and the installation of groundwater monitoring and <br /> remediation wells (vapor extraction and groundwater extraction).An estimated 5,000 square feet of disturbed <br /> area is to be restored with asphalt surfacing. <br /> Proponent: NAP Management, Inc. <br /> David E.Hunter <br /> 7525 SE 24`h Street, Suite 315 <br /> Mercer Island, WA 98040 <br /> Location: 902 N Broadway,Everett, WA 98201 <br /> Parcel No.: 29051700201100 <br /> Zoning: BMU/Broadway Mixed Use; <br /> I/Institutional Overlay Zone <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Grace Pollard Phone: (425)257-8807 <br /> OTHER AGENCIES WITH JURISDICTION <br /> 1. Puget Sound Clean Air Agency <br /> 2. Washington State Depaitinent of Ecology <br /> Mitigation Measures: The environmental impacts of this proposal are documented in the Environmental <br /> Checklist and other information oh file with the City. The listed requirements are placed in response to our <br /> review of this information: <br /> MITIGATION OF ADVERSE IMPACTS UNDER SEPA <br /> 1. Any grading/fill on this site shall be done so as to not impact the surrounding properties. (SEPA <br /> Earth, Land, and Shoreline Use Policies.) <br /> The lead agency for this proposal has determined that it does not have a probable significant adverse impact <br /> on the environment. An Environmental Impact Statement is not required under RCW 43.21C.030(2)(c). <br /> This decision was made after review of a completed environmental checklist and other infoiination on file <br /> with the lead agency. This information is available to the public on request. <br /> This proposed MDNS is issued using the option DNS process in WAC 197-11-355. The City as the lead <br /> agency has determined that significant adverse environmental impacts are unlikely; therefore through the <br /> optional MDNS process, comments must be submitted by October 13,2017 or fourteen (14) days after the <br /> SEPA17-014 <br /> Page 1 of 4 <br />