Laserfiche WebLink
REQUEST FOR COMMENTS ON <br /> LAND USE APPLICATION <br /> Project#: SEPA17-014 <br /> Project Planner: GRACE POLLARD <br /> To: Engineering/Public Services Reviewers <br /> From: BENYAM STEPHANOS, Development Technician <br /> Date sent: 9/11/2017 <br /> Project#: SEPA17-014 <br /> Associated project 4(s): <br /> Proposal: Removal of gas station USTs, pumps, and excavate soil <br /> Location: 902 N BROADWAY <br /> Applicant: NAP Management <br /> • Share Point Link to attachments if electronic submission: (copy& paste into your browser) <br /> https://ftp.everettwa.gov/?ShareToken=25B6AEDE520733595A02BF47C652909DAC7ACFB4 <br /> Return your comments to BENYAM STEPHANOS by 9/5/2017. <br /> (Even if your response is "No Comment") <br /> COMMENTS: (Please write directly on this form) <br /> Name& Date: Brian Doolan 8/31/17 <br /> Site water is to be handled in the correct methods. No discharge will be accepted by the City with out a Discharge <br /> Authorization. <br /> Distribution List(Route all plans/materials): <br /> ®Development Technician -BENYAM STEPHANOS <br /> Sewer& Drainage: <br /> ®Brian Doolan (always gets plans) <br /> ®Amie Roshak(always gets plans, Drainage Report when Combined System) <br /> ❑Jane Zimmerman (gets plans & Drainage Report when separated System) <br /> ❑Erik Emerson (gets plans & Drainage Report when Waterfront Place Central) <br /> ®Real Property—Mike Palacios <br /> ®Building Official—Tony Lee <br /> ®Permit Services Manager—Paul McKee <br /> ®Traffic—Michael Brick <br /> ®Water—Richard Hefti <br /> ®Water—Jim Spooner(share with Tim Markham) <br /> ®Transit and Transportation—Vincent Bruscas <br /> ®Industrial Pretreatment—Jeff Kerwin <br /> CC List(Route Distribution Sheet Only): <br /> ®Streets—Roy Harris <br /> ®Utilities—Mark Sadler <br /> ®Public Works Director—Dave Davis (include copy of site plan when available) <br /> Revised 4/5/2017 DIST1708-011 <br />