Laserfiche WebLink
3. Address and phone number of applicant and contact person: fhelpl <br /> 206 920 6348 <br /> Osborn Architects Inc(0A1) <br /> 1011 SW Klickitat Way No.208 <br /> Seattle, WA 98134 <br /> 206 920 6348 <br /> 4. Date checklist prepared: <br /> November 13,2017 <br /> 5. Agency requesting checklist: <br /> Puget Sound Clean Air Agency(PSCAA) <br /> 6. Proposed timing or schedule (including phasing, if applicable): <br /> College is installing a paint booth as part of the Composites program which is part of AMTEC: <br /> Advanced Manufacture ring and Technology Education Center. Booth cannot be installed without <br /> PSCAA approval;PSCAA cannot approve without SEPA Determination of Non-Significance" <br /> 7. Do you have any plans for future additions, expansion, or further activity related to or connected <br /> with this proposal? If yes, explain. <br /> There are no future additions, expansions planned with this proposal <br /> 8. List any environmental information you know about that has been prepared, or will be prepared, <br /> directly related to this proposal. <br /> PSCAA Application form. <br /> 9. Do you know whether applications are pending for governmental approvals of other proposals <br /> directly affecting the property covered by your proposal? If yes, explain. <br /> Paint Booth is under City of Everett Review for Building, Mechacnial and Electrical permits. <br /> 10. List any government approvals or permits that will be needed for your proposal, if known. <br /> Building Permit 11B1710-028:Mechanical permit is being reviewed under this permit number <br /> 11. Give brief, complete description of your proposal, including the proposed uses and the size of the <br /> project and site. There are several questions later in this checklist that ask you to describe <br /> certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead <br /> agencies may modify this form to include additional specific information on project description.) <br /> We are proposing the addition of a Composite Paint Booth on the northeast corner of the Advanced <br /> Manufacturing and Education Center(AMTEC)Building on the Everett Community College Campus. The <br /> booth is 21'-11"wide by 36'-7"long with an additional 5'to 6'walkway around the booth. The total <br /> footprint is 32'-11"wide by 42'-7"long. The booth will tie into the existing AMTEC building. <br /> 12. Location of the proposal. Give sufficient information for a person to understand the precise <br /> location of your proposed project, including a street address, if any, and section, township, and <br /> range, if known. If a proposal would occur over a range of area, provide the range or boundaries <br /> of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if <br /> reasonably available. While you should submit any plans required by the agency, you are not <br /> required to duplicate maps or detailed plans submitted with any permit applications related to this <br /> checklist. <br /> The location of the project is the northeast corner of the AMTEC Building on the east end of the Everett <br /> Community College Campus. The address is 909 North Broadway Avenue, Everett, WA 98201. <br /> B. ENVIRONMENTAL ELEMENTS <br /> 1. Earth <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 10 <br />