Laserfiche WebLink
I <br /> Construction Stormwater Pollution Prevention Plan Checklist <br /> Project Name: <br /> Construction Permit No. <br /> City Reference No. <br /> Erosion Problem Areas <br /> 1. Description of potential erosion problems on site. <br /> Construction Phasing <br /> 1. Construction sequence <br /> 2. _Construction phasing(if proposed) <br /> Construction Schedule <br /> 1. Provide a proposed construction schedule. <br /> 2. Wet Season Construction Activities <br /> _a.Proposed wet season construction activities. <br /> b. Proposed wet season construction restraints for environmentally sensitive/critical <br /> areas. <br /> Financial/Ownership Responsibilities <br /> 1. Identify the property owner responsible for the initiation of bonds and/or other <br /> financial securities. <br /> 2. _Describe bonds and/or other evidence of financial responsibility for liability <br /> associated with erosion and sedimentation impacts. <br /> Engineering Calculations <br /> 1. Provide Design Calculations. <br /> a. Sediment Ponds/Traps <br /> b.Diversions <br /> c. Waterways <br /> d.Runoff/Stormwater Detention Calculations <br /> Volume II—Construction Stormwater Pollution Prevention-December 2014 <br /> 3-30 <br />