Laserfiche WebLink
Construction Stormwater Pollution Prevention Plan Checklist <br /> Project Name: <br /> Construction Permit No. <br /> City Reference No. <br /> Section II-Erosion and Sediment Control Plans <br /> General <br /> 1. _Vicinity Map <br /> 2. City/County of Clearing and Grading Approval Block <br /> 3. Erosion and Sediment Control Notes <br /> Site Plan <br /> 1. Note legal description of subject property. <br /> 2. Show North Arrow. <br /> 3. Indicate boundaries of existing vegetation, e.g.tree lines,pasture areas, etc. <br /> 4. Identify and label areas of potential erosion problems. <br /> 5. _Identify on-site or adjacent surface waters,critical areas and associated buffers. <br /> 6. Identify FEMA base flood boundaries and Shoreline Management boundaries <br /> (if applicable). <br /> 7. Show existing and proposed contours. <br /> 8. Indicate drainage basins and direction of flow for individual drainage areas. <br /> 9. Label final grade contours and identify developed condition drainage basins. <br /> 10. Delineate areas that are to be cleared and graded. <br /> 11. _Show all cut and fill slopes indicating top and bottom of slope catch lines. <br /> Conveyance Systems <br /> 1. Designate locations for swales,interceptor trenches,or ditches. <br /> 2. Show all temporary and permanent drainage pipes,ditches,or cut-off trenches <br /> required for erosion and sediment control. <br /> 3. Provide minimum slope and cover for all temporary pipes or call out pipe inverts. <br /> 4. Show grades, dimensions,and direction of flow in all ditches,swales, culverts and <br /> pipes. <br /> 5. Provide details for bypassing off-site runoff around disturbed areas. <br /> 6. Indicate locations and outlets of any dewatering systems. <br /> Location of Detention BMPs <br /> 1. Identify location of detention BMPs. <br /> Volume II—Construction Stormwater Pollution Prevention -December 2014 <br /> 3-31 <br />