My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 EVERETT AVE SEPA 018 - 008 Drainage Report 2025-04-15
>
Address Records
>
EVERETT AVE
>
2201
>
SEPA 018 - 008
>
Drainage Report
>
2201 EVERETT AVE SEPA 018 - 008 Drainage Report 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:05:08 AM
Creation date
4/15/2025 7:52:34 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2201
Tenant Name
SEPA 018 - 008
Address Document Type
Drainage Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br /> This project is for the demolition of an existing concrete block single story office/ <br /> Wearhouse building and construction of a three story Mini Storage Building. Currently <br /> the site and frontage along Everett Ave are entirely coved with impervious surfaces. This <br /> project will lower the impervious surface area for this site and right-of-way by providing <br /> Lawn and Landscaping areas. The site is within the combined City of Everett stormwater <br /> and sewer area for additional information see the Attached Combined System Map and <br /> Public Works Policy#: 2-11 Attached to this report. The site is exempt from Minimum <br /> Requirement#6—Runoff Treatment by reducing the impervious surface area. Two Bio <br /> retention areas have been provided the developer to reduce flows and water quality <br /> requirements and be credited against the project's sewer connection charge (EMC <br /> 14.08.135) <br /> The site is subject to the requirements of the City of Everett 2010 Stormwater <br /> Management Manual and the Washington State Department of Ecology's 2012 <br /> Stormwater Management Manual for Western Washington, as amended in 2014 (2014 <br /> SWMMWW). <br /> This report is intended as satisfying the Minimum Requirements 1 through 5 for the City <br /> of Everett Stormwater Management Manual. <br /> Minimum Requirement#1: Stormwater Site Plan Preparation <br /> See attached Drainage, C-SWPPP and Site Plan as prepared by BRL Services LLC dated <br /> 6/1/18 <br /> The project is for the construction of a three-story mini storage building on a 0.78-acre <br /> site. Less than 1 acer of land disturbance will be required for this development. <br /> Existing structures will be removed from site. The soils found onsite are Alderwood- <br /> Urban land complex. <br /> The following is a breakdown of pervious and impervious surfaces: <br /> Site Area =34,718 sf =0.78 ac(no ex. pervious surface) <br /> Existing Building = 17,479 sf =0.40 ac <br /> New Building = 18,500 sf =0.43 ac <br /> Frontage Landscape = 2,963 sf =0.07 ac(new pervious surface) <br /> Parking & Driveway = 13,255 sf =0.21 ac <br /> R/W to Ex Flow Line = 8,168 sf =0.19 ac (no ex. pervious surface) <br /> Right of Way Landscaping = 3,019 sf =0.07 ac (new pervious surface) <br /> Pre and Post Basin Area =0.97 ac <br /> Minimum Requirement#2: Construction Stormwater Pollution Prevention <br /> For additional information see the SWPPP prepared for the Washington State Department <br /> of Ecology Prepared by BRL Services LLC Brian R Lindsay(CESCL)dated 6/4/18. <br />
The URL can be used to link to this page
Your browser does not support the video tag.