Laserfiche WebLink
b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> This is not an applicable question because the proposed project will not result in an increased need for <br /> public services;therefore, no proposed measures to reduce or control direct impacts on public services <br /> were made. <br /> 16. Utilities <br /> a. Circle utilities currently available at the site: <br /> IMICEN>4I M1 > (41Mriref 4 le.hoi: <4;fighlriMePrO eptic system, <br /> other storm drain lines <br /> Facility is on CSO. <br /> b. Describe the utilities that are proposed for the project,the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> The project will replace all exisiting utilites on site affected by the project.All utilities on site are private <br /> utilities under the property owner. The proposed project will only affect one on site storm drain line.All <br /> roof drains from the building for demolition feed the existing line and the excavation area will be paved <br /> to match existing flow conditions. The storm drain line will be replaced during site restoration. <br /> C. Signature <br /> The above answers are true and complete to the best of my knowledge. I understand that the lead <br /> agency is relying on them to make its decision. <br /> Signature: <br /> Name of signee <br /> Position and Agency/Organization <br /> Date Submitted: <br /> SEPA Environmental checklist(WAC 197.11.960) July 2016 Page 16 of 16 <br />