My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
>
Address Records
>
EVERGREEN WAY
>
5200
>
SEPA 017 - 010
>
Land Use Decision Documents
>
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:49:18 AM
Creation date
4/15/2025 8:48:41 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Tenant Name
SEPA 017 - 010
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept <br /> clean <br /> and open for pedestrian travel <br /> 11. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted <br /> per City Design and Construction Standards and Specifications for Development. <br /> 12. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 13. If the proposed fill is intended to support structures at a later date, the fill shall be placed in <br /> accordance with Appendix J of the International Building Code. Should the applicant not wish <br /> to construct a fill intended to support a structure at a later date, the applicant will be required to <br /> submit a letter to the City so stating. The letter will be recorded against the property. <br /> 14. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 15. All contaminated soil and excavated material from foundation, shall be hauled to an <br /> approved,permitted site. No wasting of material is allowed on this building lot. <br /> 16. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> 17. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 18. Remove erosion control measures upon completion of the project prior to final approval of <br /> the permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.