Laserfiche WebLink
10. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept <br /> clean <br /> and open for pedestrian travel <br /> 11. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted <br /> per City Design and Construction Standards and Specifications for Development. <br /> 12. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 13. If the proposed fill is intended to support structures at a later date, the fill shall be placed in <br /> accordance with Appendix J of the International Building Code. Should the applicant not wish <br /> to construct a fill intended to support a structure at a later date, the applicant will be required to <br /> submit a letter to the City so stating. The letter will be recorded against the property. <br /> 14. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 15. All contaminated soil and excavated material from foundation, shall be hauled to an <br /> approved,permitted site. No wasting of material is allowed on this building lot. <br /> 16. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> 17. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 18. Remove erosion control measures upon completion of the project prior to final approval of <br /> the permit. <br />