My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
>
Address Records
>
EVERGREEN WAY
>
5200
>
SEPA 017 - 010
>
Land Use Decision Documents
>
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:49:18 AM
Creation date
4/15/2025 8:48:41 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Tenant Name
SEPA 017 - 010
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works—Benyam Stephanos—425.257.7289 <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with City Design <br /> and Construction Standards shall be submitted to the Public Works Department, showing site parking <br /> layout, landscaping, utilities, storm drainage, temporary construction erosion control, and all required <br /> improvements in the public right-of-way. Public Works Department approval of these drawings is <br /> required prior to any permits being issued. All improvements shall be completed, approved and <br /> warranted before the Occupancy Permit is issued/final approval is granted. <br /> 2. Parking must be per City Zoning Code and City Design and Construction Standards for Development. <br /> 3. This project must comply with the current City of Everett Building Code and Sprinkler Ordinance. <br /> 4. Stormwater shall be managed in accordance with the City's Storm water Management Manual. <br /> 5. Approval of construction plans will require demonstration that all pertinent standards and regulations <br /> are met. <br /> 6. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every structure. <br /> 7. A fire hydrant is required within 350 driving feet of every structure. The hydrant(s) must meet City <br /> specifications. <br /> 8. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 9. Lack of comment on the plans submitted with the application does not constitute approval of these <br /> plans. <br /> 10. No building materials to be stacked on sidewalk/roadway and sidewallk/roadway to be kept clean and <br /> open for pedestrian travel <br /> 11. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per City <br /> Design and Construction Standards and Specifications for Development. <br /> 12. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works Inspector. <br /> 13. If the proposed fill is intended to support structures at a later date, the fill shall be placed in accordance <br /> with Appendix J of the International Building Code. Should the applicant not wish to construct a fill <br /> intended to support a structure at a later date,the applicant will be required to submit a letter to the City <br /> so stating. The letter will be recorded against the property. <br /> 14. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 15. All contaminated soil and excavated material from foundation, shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> Page 3 of 4 <br /> SEPA17-010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.