My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
>
Address Records
>
EVERGREEN WAY
>
5200
>
SEPA 017 - 010
>
Land Use Decision Documents
>
5200 EVERGREEN WAY SEPA 017 - 010 Land Use Decision Documents 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:49:18 AM
Creation date
4/15/2025 8:48:41 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Tenant Name
SEPA 017 - 010
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is <br /> not practical due to weather or seasonal problems, the ground must be covered with mulch as directed <br /> by the City Engineer. <br /> 17. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 18. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> Page 4 of 4 <br /> SEPA17-010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.