Laserfiche WebLink
S:\MBrick\development review\2016\10-Oct\PreApp16-043.xlsx Printed:10/10/2016 11:42 AM <br /> Project Name Cemex Binding Site Plan Traffic Reviewer MGB <br /> Project Location Sievers-Duecy between Hardeson and Glenwood Dev Reviewer SF <br /> Project Description 2 Lot Binding Site Plan Planner JJ <br /> Received Date 10/5/2016 Due Date 10/11/2016 Review Date 10/10/2016 File# PreApp 16-043 <br /> Area Type EICBD DSW Everett Remainder <br /> TRAFFIC STUDY REQUIRED <br /> Worksheet 1 -Traffic Mitigation Fee and Credit Estimates <br /> Proposed Land Use Units Size Fee/Unit Impact Fee <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Fees maybe recalculated at submittal if changes occur Total $0 <br /> Existing Land Use Units Size Fee/Unit Impact Fee <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Credits only apply if use was permitted within 10 years Total $0 <br /> Table 1 -Sight Distance Requirements for Developments in the City of Everett <br /> Street Type Speed Limit Sight Distance Requirement <br /> Local Street 20 115'(Stopping Sight Distance) Based on AASHTO Green Book <br /> 25 155' stopping sight distances(page 112) <br /> 25 280'(Turning Sight Distance) <br /> 30 335' Based on AASHTO Green Book turning <br /> Arterial Street 35 390' sight distances(page 661) <br /> 40 445' <br /> 45 500' <br /> City of Everett Staff Use Only <br /> 33 <br />