My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2924 100TH ST SE 2025-06-24
>
Address Records
>
100TH ST SE
>
2924
>
2924 100TH ST SE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:49:39 AM
Creation date
4/15/2025 11:38:55 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
2924
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAINTENANCE ACTIVITIES <br /> The purpose of this maintenance program is to ensure the success of the mitigation plantings. <br /> The planting areas will be maintained in spring and fall of each year for the five years monitoring <br /> period. Maintenance activities will include the following as necessary: <br /> • Plant inspection and replacement <br /> • Control invasive species <br /> • Remove trash <br /> Following each monitoring visit, the project biologist will make recommendations for <br /> maintenance. Any replanting will be done by property owner and should be done during the fall <br /> maintenance. Maintenance should be done by hand to avoid impacts to establishing plants and <br /> existing habitat. <br /> CONTINGENCY PLAN <br /> If it is determined at any time during the monitoring period that the goals of the mitigation plan <br /> are not being met, a contingency plan will be devised to improve or alter those elements that are <br /> deficient. If measures beyond standard maintenance are required, a plan containing these <br /> measures will be approved by the City of Everett prior to implementation. <br /> FINANCIAL ASSURANCE <br /> A performance bond (assurance device) shall be provided to the City of Everett in the amount of <br /> 90% of the estimated cost for plant material and labor, monitoring, and maintenance. This bond <br /> shall be released at the end of five years upon a successful determination by the City of Everett <br /> for all portions of this mitigation project. This project shall be considered successful if it meets <br /> the performance standards listed in this plan. The following is an estimate of plant materials and <br /> labor only. This does not represent a bid to install. <br /> TOTAL QUANTITY OF ONE-GALLON PLANTS AT$11.50 EACH 66 <br /> ESTIMATED COST OF PLANT MATERIAL AND LABOR $759 <br /> ESTIMATED COST OF MONITORING (5 YEARS @ $500/yr.) $2,500.00 <br /> ESTIMATED COST OF MAINTENANCE (5 YRS. @ $500/yr.) $2,500.00 <br /> TOTAL ESTIMATED COSTS $5,759.00 <br /> TOTAL ESTIMATED COST OF BONDING $5,183.10 <br /> (90% OF COST OF MATERIAL AND LABOR, MONITORING, & MAINTENANCE) <br /> Acre Environmental Consulting, LLC November 22, 2021 <br /> Buffer Mitigation Plan for 2924 100th Street SE Page 7 <br /> Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.