Laserfiche WebLink
Sabrina Fandler <br /> From: Jane Zimmerman <br /> Sent: Monday, May 22, 2017 7:11 AM <br /> To: Sabrina Fandler <br /> Subject: SEPA#17-007, 7301 Hardeson <br /> Hi Sabrina— <br /> I have the following comments on the subject project: <br /> Stormwater from this project shall be managed in accordance with the City's current stormwater management <br /> standards. In particular, the proposed regional infiltration facility shall be analyzed and designed in full accordance with <br /> Chapter 3.3 of Volume III of the 2012 Stormwater Management Manual for Western Washington, as amended in <br /> December 2014, which has been adopted as the City of Everett's Stormwater Management Manual. The City may retain <br /> consultants at the applicant's expense to assist the review of the analysis and design of the regional infiltration facility <br /> and/or conduct site evaluations which are outside the range of staff expertise. <br /> Thank you, <br /> Jane <br /> 1 <br />