Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Project Name AGENCY <br /> CEMEX- Mountain View Business Centre Div 9 USE ' <br /> g. Proposed measures to reduce or control transportation impacts, if any: <br /> Payment of mitigation fees in accordance with the requirements of the <br /> SW Subarea Plan once end uses have been identified and trip generation <br /> has been quantified. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services (for example: <br /> fire protection, police protection, health care, schools, other)? If so, generally <br /> describe. <br /> The proposed project is in compliance with the City of Everett's <br /> Comprehensive Plan, SW Subarea Plan and does not increase public <br /> services beyond previously anticipated growth. <br /> b. Proposed measures to reduce or control direct impacts on public services, if <br /> any. <br /> None <br /> 16. Utilities <br /> a. Underline utilities currently available at the site: electricity, natural gas, water, <br /> refuse service, telephone, sanitary sewer, septic system, storm sewer, cable TV. <br /> b. Describe the utilities that are proposed for the project, the utility providing the <br /> service, and the general construction activities on the site or in the immediate <br /> vicinity which might be needed. <br /> An improvement to the existing storm system is proposed. No other <br /> utilities will be affected by the proposed project. <br /> C. The above answers are true and complete to the best of my knowledge. <br /> understand that the lead agency is relying on them to make its decision. <br /> Name: . <br /> Title: 'i�� �....4...� s� /,/ <br /> Signature: Date completed: 7 .e. Z /6"" <br /> Page /3 lb <br />