Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Project Name AGENCY <br /> • <br /> CEMEX-Mountain View Business Centre Div 9 USE <br /> properties? If so, generally describe. <br /> No <br /> c. What kinds of energy conservation features are included in the plans of this <br /> proposal? List other proposed measures to reduce or control energy impacts, if <br /> any: <br /> Development will comply with applicable energy codes. <br /> 7. Environmental Health <br /> a. Are there any environmental health hazards, including exposure to toxic <br /> chemicals, risk of fire and explosion, spill, or hazardous waste that could occur <br /> as a result of this proposal? If so, describe. <br /> No. <br /> 1) Describe special emergency services that might be required. <br /> None. <br /> 2) Proposed measures to reduce or control environmental health hazards, if any: <br /> None. <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project (for example: <br /> traffic, equipment operation, other)? <br /> Automobile, truck traffic, airplane noise from Paine Field, and the on- <br /> going Cemex operations. <br /> 2) What types and levels of noise would be created by or associated with the <br /> project on a short-term or a long-term basis (for example: traffic, construction, <br /> operation, other)? Indicate what hours noise would come from the site. <br /> Construction noises shall occur on a short term basis during <br /> construction. Construction to occur during normal business hours. <br /> FedEx delivery vehicle traffic noises to occur long-term during normal <br /> business hours. <br /> 3) Proposed measures to reduce or control noise impacts, if any: <br /> None. <br /> 8. Land and Shoreline Use <br /> a. What is the current use of the site and adjacent properties? <br /> The site is currently under reclamation by Cemex. Adjacent properties <br /> Page 7 of 12 <br />