Laserfiche WebLink
None. No impacts anticipated. <br /> 15. Public Services pinlpl <br /> a. Would the project result in an increased need for public services (for example: fire protection, <br /> police protection, public transit, health care, schools, other)? If so, generally describe. <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> 16. Utilities 'help' <br /> a. Circle utilities currently available at the site: <br /> electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, <br /> other: <br /> Electricity, natural gas, water, refuse service, telephone, sanitary sewer, storm drain and catch <br /> basins and oil/separator system. <br /> c, Describe the utilities that are proposed for the project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> No utilities will be changed or added for this project. <br /> C. Signature f HELp1 <br /> The above answers are true and complete to the best of my knowledge. I understand that the <br /> lead agency is relying on them to make its decision. <br /> eri4r&tee-AL:7/144fJ-A <br /> Signature: <br /> Name of signee: Howard W. Small, LHg. <br /> Position and Agency/Organization: Consultant— Howard GeoSupport, LLC. <br /> Date Submitted: July 18, 2018 <br /> D. Supplemental sheet for nonproject actions [HELPI <br /> (IT IS NOT NECESSARY to use this sheet for project actions) <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 14 of 16 <br />