Laserfiche WebLink
f. How many vehicular trips per day would be generated by the completed project or proposal?If <br /> known,indicate when peak volumes would occur and what percentage of the volume would be trucks <br /> (such as commercial and non-passenger vehicles). What data or transportation models were used to <br /> make these estimates? <br /> N/A.Complete demolition and removal of 98,000 SF burned down industrial structure. <br /> g.Will the proposal interfere with,affect or be affected by the movement of agricultural and forest <br /> products on roads or streets in the area?If so,generally describe. <br /> The proposal will not interfere with,affect or be affected by the movement of agricultural and forest <br /> products on roads or streets in the area. <br /> h. Proposed measures to reduce or control transportation impacts,if any: <br /> No proposed measures to reduce or control transportation impacts. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services(for example:fire protection, <br /> police protection, public transit,health care,schools,other)? If so,generally describe. <br /> The project will not increase the need for public services. f' <br /> ( <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> No proposed measures to reduce or control direct impacts on public services. <br /> 16. Utilities <br /> /f <br />