Laserfiche WebLink
a. Circle utilities currently available at the site: <br /> electricity, natural gas,water, refuse service, telephone,sanitary sewer, septic system, <br /> other <br /> b. Describe the utilities that are proposed for the project,the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> N/A. Complete demolition and removal of 98,000 SF burned down industrial structure. <br /> C. Signature <br /> The above answers are true and complete to the best of my knowledge. I understand that the lead <br /> agency is relying on them to make its decision. <br /> Signature: <br /> „i,,,,,,,*-7' (14"------ <br /> Name of signee DetA Fb4i11s <br /> Position and Agency/Organization (�h)t- 4(1o,//"a l'�-J" /06tt7,e✓ <br /> Date Submitted: 1 Z L ►7 I <br /> IV-or/nab e() ad c/C 51l(-i/l r T via addi), a -, slag P1 t i p <br /> D. supplemental sheet for non-project actions 17) <br /> (IT IS NOT NECESSARY to use this sheet for project actions) <br /> Because these questions are very general, it may be helpful to read them in conjunction <br /> with the list of the elements of the environment. <br /> /6/ <br />