Laserfiche WebLink
• 1-5 North or South <br /> • Exit 195 Marine View Drive <br /> • Left onto East Marina View Drive <br /> • Left onto WA HWY 529 N <br /> • Right onto 28th PI NE <br /> • Right onto 35th Ave NE/Ross Ave./Smith Island Rd to Dagmars Marina <br /> Part 6-Project Description <br /> 6a. Briefly summarize the overall project. You can provide more detail in 6b. [help] <br /> Approximately 875 cubic yards of material will be removed over an area of approximately 15,875 square feet(0.34 acre) <br /> within an existing boat launch basin within the marina.Sediments will be dewatered in northern portions of the marina, <br /> after which disposed of at a licensed facility(Sheets 1 and 2). <br /> 6b. Describe the purpose of the project and why you want or need to perform it. [help] <br /> Sediments to be removed have been deposited over the years by the Snohomish River and have created shoaled areas <br /> within the boat launch making it difficult for vessels to launch (Photos 1 and 2). <br /> • <br /> f • pM • <br /> Photos 1 and 2—Sediment shoaling within the boat launch <br /> 6c. Indicate the project category. (Check all that apply) [help) <br /> ® Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational <br /> ® Maintenance ❑ Environmental Enhancement <br /> 6d. Indicate the major elements of your project. (Check all that apply) [help] <br /> ORIA-16-011 Page 5 of 15 <br />