Laserfiche WebLink
❑ Aquaculture El Culvert ❑ Float ❑ Retaining Wall <br /> CIBank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) <br /> ❑ Boat House ElDike/ Levee/Jetty ❑ Geotechnical Survey <br /> ❑ Road <br /> CIBoat Launch ❑ Ditch CILand Clearing ❑ Scientific <br /> Measurement Device <br /> ❑ Boat Lift ❑ Dock/ Pier ❑ Marina/Moorage ❑ Stairs <br /> El Bridge ® Dredging El Mining ❑ Stormwater facility <br /> ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool <br /> ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin <br /> ❑ Utility Line <br /> ❑ Channel Modification ❑ Fishway <br /> 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction <br /> methods and equipment to be used. [heiDi <br /> • Identify where each element will occur in relation to the nearest waterbody. <br /> • Indicate which activities are within the 100-year floodplain. <br /> The boat launch was constructed in 1977 and has not been recently dredged.Approximately 875 cubic yards of material <br /> will be dredged over an area of approximately 15,875 square feet(0.34 acre)within the boat launch basin.Sediments will <br /> be dewatered within northern portions of the marina,after which disposed of at a licensed facility(Sheets 1 and 2). <br /> All sediment removal activities will occur within the existing marina boat launch and not extend into the main channel of <br /> the Snohomish River.Sediments to be removed have been deposited over the years by the Snohomish River and have <br /> created shoaled areas within the boat launch making it difficult for vessels to launch(Photos 1 and 2). <br /> Only the shoaling areas will be removed down to the existing mudline of approximately-3 feet MLLW(Sheets 1 and 2).A <br /> silt curtain will be deployed at the end of the existing boat launch floats to minimize turbidity within the main river <br /> channel. <br /> Sediment removal will occur using a long reach excavator and material will be placed and dewatered on the upland <br /> marina,approximately 1,200 feet from the river shoreline before transporting off site to a licensed facility(see figure <br /> below).All sediment removal will be undertaken from the boat launch shore. No barge mounted dredging will be <br /> conducted.The use of a clam shell bucket dredge will not be necessary to remove sediments. <br /> ORIA-16-011 Page 6 of 15 <br />