Laserfiche WebLink
NA <br /> 8e. Summarize impact(s)to each waterbody in the table below. [help] <br /> Activity(clear, Waterbody Impact Duration Amount of material Area (sq. ft. or <br /> dredge, fill, pile name' location2 of impact3 (cubic yards) to be linear ft.) of <br /> drive, etc.) placed in or removed waterbody <br /> from waterbody directly affected <br /> Two weeks <br /> Snohomish Lower during the <br /> Sediment Removal River Snohomish winter at 875 CY 15,875 square feet <br /> River <br /> low tide <br /> 'If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents <br /> provided. <br /> 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and <br /> indicate whether the impact will occur within the 100-year flood plain. <br /> 3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. <br /> 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount(in cubic yards) <br /> you will use, and how and where it will be placed into the waterbody. [help <br /> No fill material will be used or discharged for this project. <br /> 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, <br /> type and amount of material you will remove, and where the material will be disposed. [help] <br /> ORIA-16-011 Page 9 of 15 <br />