My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1870 ROSS AVE SEPA 017 - 017 -DAGMAR'S BOAT LAUNCH DREDGE Land Use Decision Documents 2025-04-16
>
Address Records
>
ROSS AVE
>
1870
>
SEPA 017 - 017 -DAGMAR'S BOAT LAUNCH DREDGE
>
Land Use Decision Documents
>
1870 ROSS AVE SEPA 017 - 017 -DAGMAR'S BOAT LAUNCH DREDGE Land Use Decision Documents 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 8:06:52 AM
Creation date
4/16/2025 8:05:37 AM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
1870
Tenant Name
SEPA 017 - 017 -DAGMAR'S BOAT LAUNCH DREDGE
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sediment removal will occur using a long reach excavator and material will be placed and dewatered on the upland <br /> marina,approximately 1,200 feet from the river shoreline before transporting off site to a licensed upland facility(see <br /> figure in Section 6e).A total of 875 CY of sediment will be removed from the boat launch.All sediment removal will be <br /> undertaken from the boat launch shore. No barge mounted dredging will be conducted.The use of a clam shell bucket <br /> dredge will not be necessary to remove sediments. <br /> Part 9—Additional Information <br /> Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of <br /> this section as you can. It is ok if you cannot answer a question. <br /> 9a. If you have already worked with any government agencies on this project, list them below. [help' <br /> Agency Name Contact Name Phone Most Recent <br /> Date of Contact <br /> 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington <br /> Department of Ecology's 303(d) List? [helot <br /> • If Yes,list the parameter(s)below. <br /> • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: <br /> http://www.ecy.wa.goviorodrams/wa/303d/. <br /> ❑ Yes Il No <br /> No Category 5 sites are present.One Category 1 Site is present(Water temperature) <br /> 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? thelpi <br /> • Go to http://cfpub.epa.ciov/surf/locate/index.cfm to help identify the HUC. <br /> 17110011 <br /> 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? [help' <br /> • Go to http://www.ecy.wa.qov/water/wria/index.html to find the WRIA#. <br /> WRIA 7 <br /> 9e.Will the in-water construction work comply with the State of Washington water quality standards for <br /> turbidity? [help' <br /> • Go to http://www.ecy.wagov/programs/wa/swas/criteria.html for the standards. <br /> ORIA-16-011 Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.