Laserfiche WebLink
Benyam Stephanos <br /> From: Erik Emerson <br /> Sent: Wednesday, October 11, 2017 5:15 PM <br /> To: Benyam Stephanos <br /> Subject: SEPA 17-017 Dagmars Boat Launch Dredge <br /> Benyam, <br /> I've reviewed the SEPA checklist and JARPA forms for the Dagmars Boat Launch Dredging. Based on the information <br /> provided I don't see any trigger for stormwater review. However, you should consider the following: <br /> 1. The project must comply with all applicable state and federal requirements for work within the Snohomish <br /> River. <br /> 2. Temporary storage and dewatering of removed sediment must be conducted in accordance with applicable <br /> standards including Section 2 of the City's Design and Construction Standards and Specifications for <br /> Development.Appropriate BMPs will be required to ensure that sediment and other pollutants do not enter <br /> surface waters as part of the temporary storage. <br /> 3. Permanent disposal of the dredged material should be disposed of in a manner compliant with applicable <br /> sediment control and permanent stormwater standards. <br /> Erik Emerson PE <br /> City of Everett, Public Works <br /> Senior Surface Water Engineer <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Direct: 425-257-8995, Fax: (425)257-8882 <br /> eemerson@everettwa.gov <br /> 1 <br />