My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3022-07
>
Ordinances
>
Ordinance 3022-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 10:53:54 AM
Creation date
4/6/2016 11:03:58 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3022-07
Date
7/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
test. After the 40 area test, if the system continues to fail, the building <br /> owner shall have the system altered to meet the coverage requirement <br /> established in Section 511.4. <br /> 511.8.3 The test shall be conducted using a SERS approved portable radio, <br /> communicating through the SERS as specified by the authority having <br /> jurisdiction. A spot located approximately in the center of a grid area will <br /> be selected for the test, then the radio transmitter will be activated to <br /> verify two-way communications to and from the outside of the building <br /> through the SERS system. Once the spot has been selected, prospecting <br /> for a better spot within the grid area will not be permitted. <br /> 511.8.4 The gain values of all systems used to support the signal level <br /> requirements of Section 511.4 shall be measured and the test measurement <br /> results shall be kept on file with the building owner so that the <br /> measurements can be verified each year during the annual tests. In the <br /> event that the measurement results became lost, the building owner will be <br /> required to rerun the acceptance test to re-establish that the facility <br /> provides the signal levels established in Section 511.4. <br /> 511.9 Annual equipment condition testing. <br /> 511.9.1 When an in-building radio system is required, the building owner <br /> shall test all active components of the system, including but not limited to <br /> amplifiers, power supplies, backup batteries, and related equipment, a <br /> minimum of once every 12 months. Amplifiers shall be tested to ensure <br /> that the gain is the same as it was upon initial installation and acceptance. <br /> These annual tests shall apply to both the bi-directional amplifier method <br /> of enhancing signal strength, as well as to any alternative methods that <br /> might be employed. The building owner shall notify the SERS System <br /> Manager in writing two (2) weeks in advance of when annual tests occur, <br /> and shall also notify SERS and the Fire Code Official by certified mail of <br /> the results of the test. Test records shall be retained on the inspected <br /> premises by the building owner. <br /> 511.9.2 Backup batteries and power supplies shall be tested under full <br /> load for a period of one hour to verify that, they will properly operate <br /> during an actual power outage. If within the one-hour test period, in the <br /> opinion of the testing technician, the battery exhibits symptoms of failure, <br /> the test shall be extended for additional one-hour period until the testing <br /> technician confirms the integrity of the battery. Alternative load testing <br /> which places a higher short-term demand on the battery system may be <br /> required upon verbal request by the testing technician. Batteries which fail <br /> the load test shall be replaced and retested within 10 working days. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.